Market Trends

What are Development Control Regulations: Complete Guide 2026

What are Development Control Regulations: Complete Guide 2026

02 Feb 2026

Content

No Blogs content found

It looks like there haven’t been any blogs yet!

Get answer to all your queries

We're here to help

Talk to Expert

Development Control Regulations (DCR) are statutory rules that govern how land can be developed and buildings can be constructed in urban areas. These regulations ensure orderly urban development, control land use, and regulate building construction for public welfare. Understanding DCR is essential for property buyers, developers, architects, and anyone involved in real estate transactions.

What are Development Control Regulations?

Development Control Regulations are a set of rules framed under town planning acts that control land development and building construction. DCR are part of master plans or development plans prepared by planning authorities. These regulations govern new construction, extensions, alterations, demolitions, and changes in land or building use.

DCR operates through a plan led system involving public consultation and are enforced by authorities like municipal corporations, development authorities, and metropolitan commissioners. The regulations are statutory, meaning they have legal force and violations can result in penalties or demolition.

Purpose of Development Control Regulations

Promote Planned City Growth

DCR ensures cities grow in an organized manner with proper allocation of land for residential, commercial, industrial, and public uses. This prevents haphazard development and creates livable urban environments.

Ensure Public Welfare

The regulations meet public needs for health, safety, convenience, economy, and amenity. They ensure buildings have adequate light, ventilation, fire safety measures, and access to basic services.

Prevent Land Misuse

DCR prevents misuse of land by enforcing zoning regulations. A residential plot cannot be converted to commercial use without proper approvals. This maintains the character of neighborhoods and prevents overcrowding.

Balance Private and Public Interests

While property owners have rights to develop their land, DCR balances these rights with public interest. The regulations ensure private development does not harm public welfare or neighboring properties.

Protect Urban Quality

DCR protects the quality of urban and rural areas amid economic progress. They regulate housing, industrial, and commercial development to maintain environmental standards and quality of life.

Control Density and Overcrowding

Through Floor Space Index (FSI) and height restrictions, DCR controls building density and prevents overcrowding. This ensures adequate open spaces, parking, and infrastructure capacity.

Key Components of Development Control Regulations

Zoning Regulations: Zoning divides urban areas into different zones based on permitted land use. Common zones include:

  • Residential Zones: Only residential buildings are permitted. Further divided into low density, medium density, and high density residential zones.
  • Commercial Zones: Shops, offices, hotels, and commercial establishments are permitted.
  • Industrial Zones: Manufacturing units, warehouses, and industrial activities are permitted.
  • Mixed Use Zones: Combination of residential and commercial uses are permitted.
  • Public and Semi Public Zones: Schools, hospitals, government offices, and community facilities.
  • Open Space Zones: Parks, playgrounds, and recreational areas.

Zoning ensures compatible land uses are located together and incompatible uses are separated. A factory cannot be built in a residential zone, protecting residents from pollution and noise.

Floor Space Index (FSI)

Floor Space Index, also called Floor Area Ratio (FAR), determines the maximum permissible built up area relative to the plot size. FSI is calculated by dividing total built up area by plot area.

FSI Formula:

FSI = Total Built Up Area / Plot Area

Example:

Plot Area: 1,000 square meters FSI: 2.0 Maximum Built Up Area: 2,000 square meters

With FSI of 2.0, you can construct a building with total built up area twice the plot size. This could be a ground floor of 1,000 square meters plus first floor of 1,000 square meters.

Typical FSI Values:

  • Residential Buildings: 1.5 to 2.5 in most cities
  • Commercial Buildings: 2.0 to 5.0 depending on location
  • Mumbai: Maximum FSI of 5.0 in some areas
  • Delhi: FSI ranges from 1.5 to 3.0 based on zone and road width
  • Bangalore: FSI up to 1.75 to 2.25, higher with premiums

FSI varies based on road width, plot size, location, zoning, and available infrastructure. Wider roads allow higher FSI as they can handle more traffic and density.

Setback Requirements

Setbacks are minimum distances that must be maintained from plot boundaries. Buildings cannot be constructed in setback areas, which must be kept open.

Types of Setbacks:

  • Front Setback: Distance from front boundary facing the road
  • Rear Setback: Distance from rear boundary
  • Side Setbacks: Distance from left and right boundaries

Purpose of Setbacks:

  • Safety: Provides space for fire fighting access and emergency evacuation
  • Ventilation: Ensures adequate air circulation between buildings
  • Light: Allows natural light to enter buildings
  • Privacy: Maintains distance between neighboring properties
  • Aesthetics: Creates visual space and prevents cramped appearance

Setback requirements increase with building height and plot size. Taller buildings require larger setbacks to ensure adequate light and ventilation for neighboring properties.

Example Setback Requirements:

For a building up to 10 meters height on a 500 square meter plot:

  • Front setback: 3 meters

  • Side setbacks: 1.5 meters each

  • Rear setback: 3 meters For a building above 20 meters height on the same plot:

  • Front setback: 6 meters

  • Side setbacks: 3 meters each

  • Rear setback: 6 meters

Building Height Restrictions

DCR specifies maximum building height or number of floors permitted. Height restrictions control density, urban skyline, and are linked to FSI, setbacks, and safety considerations.

Height limits are tied to road width. Wider roads allow taller buildings as they can handle more traffic and provide better access for emergency services.

Example Height Regulations:

  • Road Width 9 to 12 meters: Maximum 3 to 4 floors
  • Road Width 12 to 18 meters: Maximum 5 to 7 floors
  • Road Width above 18 meters: Maximum 10 to 15 floors or more

Maharashtra proposed increasing the high rise limit from 120 meters to 180 meters in February 2025, allowing more floors with appropriate safety checks. This promotes vertical growth in metropolitan areas where land is scarce.

Open Space Requirements

DCR mandates minimum open space on plots for recreational areas, landscaping, and environmental benefits. Open space requirements vary based on plot size and building type.

Typical Open Space Norms:

  • Residential Plots: 15 to 25 percent of plot area
  • Commercial Plots: 10 to 20 percent of plot area
  • Large Plots: 25 to 50 percent open space requirement

In Mumbai, residential plots must provide 15 percent of area for recreational ground. For larger plots, this open space is now included in FSI calculations, allowing some built up area in open spaces.

Parking Requirements

DCR specifies minimum parking spaces based on building type and area. Adequate parking prevents street congestion and ensures smooth traffic flow.

Typical Parking Norms:

  • Residential: 1 parking space per dwelling unit, 2 spaces for larger units
  • Commercial: 1 space per 50 to 100 square meters of built up area
  • Hotels: 1 space per 3 to 5 rooms
  • Hospitals: 1 space per 50 to 100 square meters

Basements are commonly used for parking and are often exempt from FSI calculations, encouraging developers to provide adequate parking without reducing saleable area.

Building Bye Laws

Building bye laws set standards for building design, construction materials, structural safety, fire safety, plumbing, electrical installations, and sanitation. These are integrated with DCR and must be followed for building approval.

Key Bye Law Requirements:

  • Structural Safety: Buildings must be designed by licensed engineers and meet structural stability standards per National Building Code.
  • Fire Safety: Fire exits, fire fighting equipment, sprinkler systems, and fire resistant materials are mandatory for buildings above certain heights.
  • Ventilation: Minimum window sizes and ventilation openings are specified for habitable rooms.
  • Sanitation: Adequate toilets, drainage, and sewage connections are required.
  • Materials: Only approved construction materials meeting quality standards can be used.

Types of FSI in India

Base FSI

Base FSI is the standard FSI permitted for a zone without any additional payments or incentives. This is the basic development right available to all plot owners in that zone.

Premium FSI

Premium FSI is additional FSI available beyond base FSI by paying a premium to the local authority. Developers pay for extra FSI to build more floors and increase saleable area. Premium FSI rates vary by location and are higher in prime areas. The revenue generated helps fund infrastructure development.

Fungible FSI

Fungible FSI allows converting common areas like balconies, lobbies, and staircases into saleable areas by paying a premium. This is common in Mumbai and some other cities. Fungible FSI can be combined with TDR to maximize built up area. For example, 20 percent fungible FSI is available in Bangalore for plots on 30 to 40 feet wide roads.

Transferable Development Rights (TDR)

TDR allows landowners who surrender land for public purposes to receive development rights certificates. These certificates can be sold to developers who want to exceed base FSI limits in receiving areas.

How TDR Works:

  • Sending Area: Landowner surrenders land reserved for roads, parks, or public facilities to the local authority.
  • TDR Certificate: Landowner receives TDR certificate based on surrendered area multiplied by zonal FSI.
  • Receiving Area: Developer buys TDR certificate and uses it to build extra floors in high density zones.

Example:

Landowner surrenders 500 square meters in a zone with FSI 2.0. TDR certificate value is 500 x 2.0 = 1,000 square meters of additional built up area.

The developer buys this TDR and uses it on another plot to build 1,000 square meters extra area beyond base FSI.

Benefits of TDR:

  • For Government: Acquires land for public purposes without cash payment, reducing acquisition costs.
  • For Landowner: Receives marketable certificate instead of losing land without compensation.
  • For Developer: Can exceed FSI limits and build more floors, increasing profitability.
  • For City: Enables urban densification by transferring development potential from restricted zones to infrastructure ready areas.

TDR value fluctuates with market demand, zoning changes, and policy revisions. Success depends on developer interest and minimum pricing mechanisms.

State Wise DCR Variations

Mumbai DCR

Mumbai is governed by Development Control and Promotion Regulations (DCPR) 2034 under the Municipal Corporation of Greater Mumbai (MCGM). The regulations originated with 1967 rules, replaced by 1991 regulations, with major amendments in 2012 and 2018.

Key Mumbai DCR Norms:

  • Base FSI: Increased post 2012 amendments, varies by zone
  • Premium FSI: Available by paying premium to MCGM
  • Maximum FSI: Up to 5.0 in some areas
  • Open Space: 15 percent of residential plots for recreational ground
  • Redevelopment Incentives: Additional area for societies older than 30 years
  • Slum Rehabilitation: Minimum unit sizes specified under DCPR 2034

Mumbai Metropolitan Region (MMR) has had a separate DCR from 1999. Airport areas have their own regulations.

Amendments since 2012 aimed at transparency and curbing discretion in approvals. Fungible FSI is widely used in Mumbai to maximize built up area.

Delhi DCR

Delhi is governed by the Master Plan for Delhi (MPD) 2021 under the Delhi Development Authority (DDA). Building bye laws focus on FSI, setbacks, and mixed use norms.

Key Delhi DCR Norms:

  • FSI Range: 1.5 to 3.0 depending on zone and road width
  • Height Restrictions: Linked to road width and plot coverage
  • Mixed Use: Permitted in designated zones
  • Green Spaces: Mandatory open space requirements

Consult official DDA MPD documents for current FAR (equivalent to FSI), height restrictions, and green space rules. Delhi has strict enforcement with penalties for violations.

Bangalore DCR

Bangalore is regulated by Bruhat Bengaluru Mahanagara Palike (BBMP) Building Bye Laws 2003 (amended) and Karnataka Town and Country Planning Act.

Key Bangalore DCR Norms:

  • Base FSI: 1.75 to 2.25 for most areas
  • Premium FSI: Available with payment, can reach higher FSI with TDR
  • Fungible FSI: 20 percent for plots on 30 to 40 feet roads
  • Open Space: 25 to 50 percent based on plot size
  • Height Restrictions: Linked to road width

Refer to BBMP or Karnataka Urban Development portal for latest Revised Master Plan 2031 norms. Bangalore has been updating regulations to accommodate rapid urbanization.

Other Major Cities

  • Pune: Regulated by Pune Municipal Corporation with specific setback requirements for taller buildings to ensure air circulation.
  • Hyderabad: Governed by Greater Hyderabad Municipal Corporation (GHMC) with FSI norms varying by zone.
  • Chennai: Regulated by Chennai Metropolitan Development Authority (CMDA) with specific coastal zone regulations.
  • Ahmedabad: Governed by Ahmedabad Municipal Corporation with TDR provisions for urban densification.

Each city has a unique DCR based on local conditions, infrastructure capacity, and urban planning goals. Always consult local planning authorities for plot specific information.

Building Approval Process

Step 1: Verify Land Ownership and Zoning

  • Legal Ownership: Verify with title deeds, patta or chitta, and encumbrance certificates.
  • Zoning: Ensure land is in a non agricultural or residential zone and complies with zoning regulations.
  • Land Use Conversion: If land is agricultural, obtain Land Use Conversion (LUC or NA) permission from revenue authorities.

Step 2: Hire Licensed Architect

Hire a licensed architect or engineer to prepare detailed building plans including:

  • Site Plan: Shows plot boundaries, setbacks, and building footprint
  • Floor Plans: Layout of each floor with room dimensions
  • Elevations: Front, side, and rear views of building
  • Structural Drawings: Foundation, columns, beams, and slab details
  • Area Calculations: FSI calculations and compliance statement

Plans must comply with local bye laws and DCR.

Step 3: Obtain Soil Test Report

Conduct soil tests to determine bearing capacity and foundation requirements. Structural stability report is necessary for approval.

Step 4: Submit Application

Submit application online or offline to local authority:

  • Municipal Corporations: BBMP Bangalore, MCGM Mumbai
  • Development Authorities: CMDA Chennai, DDA Delhi

Required documents include:

  • Building plans prepared by licensed architect
  • Land ownership documents
  • Aadhaar and PAN of owner
  • Architect license copy
  • Soil test report

Step 5: Obtain NOCs

No Objection Certificates (NOCs) are mandatory from various departments:

  • Water and Sewage Board: For water supply and sewage connections
  • Electricity Board: For power supply
  • Fire Department: For buildings above certain height
  • Pollution Control Board: For projects exceeding certain thresholds
  • Airport Authority: In airport zones
  • Heritage Department: Near protected sites

Step 6: Scrutiny and Inspection

Authorities conduct scrutiny of plans to verify compliance with:

  • Building bye laws
  • DCR norms
  • FSI calculations
  • Setback requirements
  • Height restrictions
  • Parking norms Site inspection is conducted to verify plot boundaries and surroundings.

Step 7: Pay Fees

Applicable fees include:

  • Scrutiny fee
  • Development charges
  • Betterment charges
  • Labor welfare cess

Step 8: Receive Approval

If the application is compliant, approval is granted with a permit number. Approval is typically valid for 3 to 5 years. Revisions or rejection are possible for:

  • FSI violations
  • Encroachments
  • Missing documentation
  • Non compliance with setbacks

Step 9: Commencement Permit

Obtain commencement permit before starting construction. Display permit number at construction site.

Step 10: Completion and Occupancy Certificate

After construction completion:

  • Completion Certificate (CC): Issued after final inspection confirming construction as per approved plans.
  • Occupancy Certificate (OC): Essential for legal occupation, utility connections, and property resale.

Approval Timelines

  • Individual Houses: 15 to 30 days (often longer in practice)
  • Apartments: 2 to 6 months
  • Commercial Buildings: 3 to 12 months due to more NOCs

Some states like Telangana offer faster single window systems. Using auto DCR software can expedite validation.

DCR Violations and Penalties

Types of Violations

  • FSI Violations: Building more area than permitted FSI
  • Setback Violations: Constructing in setback areas
  • Height Violations: Exceeding permitted height limits
  • Zoning Violations: Using property for unauthorized purposes
  • Unauthorized Construction: Building without approval

Penalties for Violations

  • Monetary Penalties: ₹10 lakh to ₹1 crore per site depending on violation severity.
  • Demolition: Unauthorized construction can be demolished at owner's cost.
  • Stop Work Orders: Construction is stopped until violations are rectified.
  • Denial of Services: Utility connections like water and electricity are denied.
  • Legal Action: Criminal prosecution under relevant acts.
  • Blacklisting: Developers can be blacklisted from future projects.

Recent Enforcement Examples

In Delhi, fines worth ₹2.36 crore were imposed across 35 construction sites for pollution and dust control violations. 48 sites were ordered to shut down. Show cause notices were issued to over 200 sites.

Common violations include absent dust barriers, uncovered materials, failure to wash vehicle wheels, inadequate water sprinkling, lack of worker masks, and non registration on pollution control web portals.

Delhi Pollution Control Committee (DPCC) has over 1,800 enforcement personnel and 35 dedicated teams conducting inspections across over 4,800 mapped localities.

Consequences for Property Buyers

Buying property with DCR violations can result in:

  • No Occupancy Certificate: Cannot legally occupy the property
  • No Utility Connections: Water, electricity, and gas connections denied
  • Resale Difficulties: Cannot sell property without proper approvals
  • Demolition Risk: Illegal portions may be demolished
  • Legal Liability: Buyer may face legal action

Always verify building approvals, completion certificate, and occupancy certificate before buying property.

Importance of DCR Compliance

For Property Buyers

Legal Occupation: Only DCR compliant properties can be legally occupied. Utility Connections: Water, electricity, and gas connections require occupancy certificates. Resale Value: Properties with proper approvals have higher resale value and are easier to sell. Home Loans: Banks provide home loans only for DCR compliant properties with occupancy certificates. No Legal Hassles: Avoid demolition risk and legal complications.

For Developers

Project Approval: Cannot start construction without DCR compliant plans. Avoid Penalties: Compliance prevents monetary penalties and demolition. Market Reputation: Compliant projects attract buyers and command premium prices. Timely Completion: No delays due to stop work orders or legal issues. Bank Funding: Construction finance available only for approved projects.

For Society

  • Planned Development: DCR ensures cities grow in an organized manner.
  • Safety: Compliance ensures structural safety, fire safety, and emergency access.
  • Quality of Life: Adequate open spaces, parking, and infrastructure improve living standards.
  • Environmental Protection: Regulations protect green spaces and control pollution.
  • Infrastructure Capacity: Density control ensures infrastructure can support the population.

How to Check DCR Compliance

Before Buying Property

Request Documents:

  • Approved building plans
  • Commencement certificate
  • Completion certificate
  • Occupancy certificate

Verify with Authority: Check with local municipal corporation or development authority if approvals are genuine.

Physical Inspection: Compare actual construction with approved plans. Check for:

  • Setback violations
  • Unauthorized additional floors
  • Encroachments on common areas

Hire Expert: Engage architect or legal expert to verify DCR compliance. Online Verification:- Many cities offer online verification of building approvals:

Mumbai: MCGM website for approved plans Delhi: DDA website for building sanctions Bangalore: BBMP website for plan approvals

Enter property address or survey number to check approval status.

Recent DCR Amendments and Trends

Increased FSI Limits

Many cities are increasing FSI limits to promote vertical growth and accommodate urban population. Mumbai, Delhi, and Bangalore have revised FSI norms in recent years.

Single Window Clearance

States are implementing single window systems to expedite approvals. Telangana and Andhra Pradesh have successful single window clearance systems reducing approval time.

Auto DCR Software

Automated DCR checking software validates building plans against regulations instantly. This reduces human discretion and speeds up approvals.

Mixed Use Development

Cities are promoting mixed use development allowing residential and commercial uses in the same building. This reduces travel distances and creates vibrant neighborhoods.

Sustainability Norms

New DCR includes green building norms, rainwater harvesting requirements, solar panel mandates, and waste management provisions.

Redevelopment Incentives

Cities like Mumbai offer additional FSI for redevelopment of old buildings and slum rehabilitation. This encourages urban renewal and improves housing quality.

Conclusion

Development Control Regulations are the foundation of orderly urban development in India. These statutory rules govern land use, building construction, FSI, setbacks, height restrictions, and various other aspects of development.

Understanding DCR is essential for property buyers to ensure they purchase legal, compliant properties with proper approvals. For developers, DCR compliance is mandatory to obtain building approvals and avoid penalties.

Key components of DCR include zoning regulations, Floor Space Index, setback requirements, building height restrictions, open space norms, parking requirements, and building bye laws. These vary by city and state based on local conditions and planning goals.

The building approval process involves verifying land ownership, hiring licensed architects, obtaining NOCs from various departments, and securing commencement and occupancy certificates. Violations can result in penalties ranging from ₹10 lakh to ₹1 crore, demolition orders, and legal action.

Recent trends include increased FSI limits, single window clearance systems, auto DCR software, mixed use development, and sustainability norms. Cities are updating regulations to accommodate urbanization while ensuring safety, quality of life, and environmental protection.

Always verify DCR compliance before buying property by checking approved plans, completion certificate, and occupancy certificate. Consult local planning authorities for plot specific information as regulations are subject to change.


Share with

Contact Us

Fill out this form
& we'll get back
to you

Afghanistan
+93
Albania
+355
Algeria
+213
Andorra
+376
Angola
+244
Antigua and Barbuda
+1268
Argentina
+54
Armenia
+374
Aruba
+297
Australia
+61
Austria
+43
Azerbaijan
+994
Bahamas
+1242
Bahrain
+973
Bangladesh
+880
Barbados
+1246
Belarus
+375
Belgium
+32
Belize
+501
Benin
+229
Bhutan
+975
Bolivia
+591
Bosnia and Herzegovina
+387
Botswana
+267
Brazil
+55
British Indian Ocean Territory
+246
Brunei
+673
Bulgaria
+359
Burkina Faso
+226
Burundi
+257
Cambodia
+855
Cameroon
+237
Canada
+1
Cape Verde
+238
Caribbean Netherlands
+599
Cayman Islands
+1
Central African Republic
+236
Chad
+235
Chile
+56
China
+86
Colombia
+57
Comoros
+269
Congo
+243
Congo
+242
Costa Rica
+506
Côte d'Ivoire
+225
Croatia
+385
Cuba
+53
Curaçao
+599
Cyprus
+357
Czech Republic
+420
Denmark
+45
Djibouti
+253
Dominica
+1767
Dominican Republic
+1
Ecuador
+593
Egypt
+20
El Salvador
+503
Equatorial Guinea
+240
Eritrea
+291
Estonia
+372
Ethiopia
+251
Faroe Islands
+298
Fiji
+679
Finland
+358
France
+33
French Guiana
+594
French Polynesia
+689
Gabon
+241
Gambia
+220
Georgia
+995
Germany
+49
Ghana
+233
Greece
+30
Greenland
+299
Grenada
+1473
Guadeloupe
+590
Guam
+1671
Guatemala
+502
Guinea
+224
Guinea-Bissau
+245
Guyana
+592
Haiti
+509
Honduras
+504
Hong Kong
+852
Hungary
+36
Iceland
+354
India
+91
Indonesia
+62
Iran
+98
Iraq
+964
Ireland
+353
Israel
+972
Italy
+39
Jamaica
+1876
Japan
+81
Jordan
+962
Kazakhstan
+7
Kenya
+254
Kiribati
+686
Kosovo
+383
Kuwait
+965
Kyrgyzstan
+996
Laos
+856
Latvia
+371
Lebanon
+961
Lesotho
+266
Liberia
+231
Libya
+218
Liechtenstein
+423
Lithuania
+370
Luxembourg
+352
Macau
+853
Macedonia
+389
Madagascar
+261
Malawi
+265
Malaysia
+60
Maldives
+960
Mali
+223
Malta
+356
Marshall Islands
+692
Martinique
+596
Mauritania
+222
Mauritius
+230
Mayotte
+262
Mexico
+52
Micronesia
+691
Moldova
+373
Monaco
+377
Mongolia
+976
Montenegro
+382
Morocco
+212
Mozambique
+258
Myanmar
+95
Namibia
+264
Nauru
+674
Nepal
+977
Netherlands
+31
New Caledonia
+687
New Zealand
+64
Nicaragua
+505
Niger
+227
Nigeria
+234
North Korea
+850
Norway
+47
Oman
+968
Pakistan
+92
Palau
+680
Palestine
+970
Panama
+507
Papua New Guinea
+675
Paraguay
+595
Peru
+51
Philippines
+63
Poland
+48
Portugal
+351
Puerto Rico
+1
Qatar
+974
Réunion
+262
Romania
+40
Russia
+7
Rwanda
+250
Saint Kitts and Nevis
+1869
Saint Lucia
+1758
Saint Pierre & Miquelon
+508
Saint Vincent and the Grenadines
+1784
Samoa
+685
San Marino
+378
São Tomé and Príncipe
+239
Saudi Arabia
+966
Senegal
+221
Serbia
+381
Seychelles
+248
Sierra Leone
+232
Singapore
+65
Slovakia
+421
Slovenia
+386
Solomon Islands
+677
Somalia
+252
South Africa
+27
South Korea
+82
South Sudan
+211
Spain
+34
Sri Lanka
+94
Sudan
+249
Suriname
+597
Swaziland
+268
Sweden
+46
Switzerland
+41
Syria
+963
Taiwan
+886
Tajikistan
+992
Tanzania
+255
Thailand
+66
Timor-Leste
+670
Togo
+228
Tonga
+676
Trinidad and Tobago
+1868
Tunisia
+216
Turkey
+90
Turkmenistan
+993
Tuvalu
+688
Uganda
+256
Ukraine
+380
United Arab Emirates
+971
United Kingdom
+44
United States
+1
Uruguay
+598
Uzbekistan
+998
Vanuatu
+678
Vatican City
+39
Venezuela
+58
Vietnam
+84
Wallis & Futuna
+681
Yemen
+967
Zambia
+260
Zimbabwe
+263